DBI SALA Flexiguard 8530564 Handleiding voor installatie-instructies - Pagina 4
Blader online of download pdf Handleiding voor installatie-instructies voor {categorie_naam} DBI SALA Flexiguard 8530564. DBI SALA Flexiguard 8530564 8 pagina's. Concrete mounted jib base
Ook voor DBI SALA Flexiguard 8530564: Gebruiksaanwijzing (18 pagina's)
Step - 3: Installing the Jib Mast into the Jib Base.
• Lower the Jib Mast until the Rotation Block (A) is resting in the Locking Slot (B) in the Jib Base. (See
Figure 4 -
.)
A
IMPORTANT: Insert the Base Cap into the Jib Base when the Jib Mast is not in the Jib Base.
INSPECTION:
IMPORTANT: Extreme working conditions (harsh environments, prolonged use) may require increasing the
frequency of inspections..
WARNING: If the system has been damaged do to fall arrest, it must be immediately removed from service,
inspected, or contact Capital Safety for repair or replacement.
Before Every use:
• All fasteners must be tight, secure and not damaged.
• Inspect for corrosion or rust.
• All labels must be present and fully legible.
• Inspect for cracks around the Jib Base.
• Record results of inspection in the inspection and maintenance log provided.
• If inspection reveals an unsafe or defective condition, remove Concrete Mounted Jib Base from service
and destroy, or contact Capital Safety for repair or replacement.
Monthly:
• A formal inspection should be done by a Competent Person
inspection in the inspection and maintenance log provided.
LABELS
:
A
B
C
D
1 Competent Person:
One who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazard-
ous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them.
™
9511992 rev.c
4
other than the user. Record results of
1
C
D
B
A
(See Figure 4 -
B
.)
B