AGS Merlin 2000S Installatie- en bedieningshandleiding - Pagina 4
Blader online of download pdf Installatie- en bedieningshandleiding voor {categorie_naam} AGS Merlin 2000S. AGS Merlin 2000S 12 pagina's. Gas proving and ventilation interlock system
Ook voor AGS Merlin 2000S: Gebruikershandleiding (12 pagina's), Installatie- en bedieningshandleiding (12 pagina's)
Installation & Operation Manual
Typical Installation Arrangement
Terminal Connections
1. POWER / LINE IN
110-120V AC Power should be supplied to the [POWER / LINE IN] terminal and fused at 3A.
On connecting the mains supply to the panel the power LED indicator will light up – this is
located on the front cover (American Gas Safety Logo).
2. GAS SOLENOID VALVE OUTPUT
100-120V AC electrical power supplied from the [VALVE OUT] connector using a 3 core cable
can be connected to a gas solenoid valve which can shut the gas supply on alarm status.
Refer to your valve manual for more information and wiring!
3. SUPPLY & EXTRACT FAN PRESSURE DIFFERENTIAL SWITCHES / CURRENT MONITORS
These terminals are used to receive an input signal from external air pressure switches or
external current monitors. These terminals have factory fitted links installed.
If only one fan is being used – leave factory fitted links in terminals NOT IN USE!
1500S IOM Rev: 08
01-20
Merlin 1500S
4