Centurion R5 Handleiding voor snelle installatie - Pagina 12
Blader online of download pdf Handleiding voor snelle installatie voor {categorie_naam} Centurion R5. Centurion R5 19 pagina's. Rotary swing gate operator
Ook voor Centurion R5: Handleiding voor snelle installatie (2 pagina's), Handleiding voor snelle installatie (17 pagina's)
1.
220V AC mains cable (3 core LNE
2
0,5mm )*†, via mains isolator switch
Or
Low voltage 16V AC battery charger
supply (2 core 1,5mm )†.
2.
Intercom cable (n1 + 6 core) to
house.
3.
Slave motor cable (if required) (3
2
core 2,5mm + 3 core 0,5mm
multistranded).
n1 = number of cores required by intercom.
* Increase cable thickness if pillar lights are to be installed.
† Screened cable is always recommended to provide better protection against lightning - earth one end
of screening.
2
S
ET UP THE
Release the manual override and close the gate(s).
Use the origin tool and line up marks as in figure 10. (IM page 28)
Open gate ½ way and unscrew the manual release mechanism. (IM
page 28).
S
ETTING THE
Manual Release
Mechanism
Figure 10 Origin Setup
10
CABLE REQUIREMENTS
2
2
G
ATE
G
O
ATE
RIGIN
Setup Tool
4.
Radio receiver cable (3 core 0,5mm
multistranded).
5.
Pedestrian key switch (if required) (2
2
core 0,5mm multistranded).
6.
Infrared beams or safety edge (if
required) (3 core 0,5mm
multistranded)
7.
Intercom cable (n2+2 core 0,5mm
multistranded) to gate station.
n2 = number of cores required by intercom.
O
RIGIN
2
2
2