Green motion PIPISTREL SKYCHARGE Handleiding technische documentatie - Pagina 4
Blader online of download pdf Handleiding technische documentatie voor {categorie_naam} Green motion PIPISTREL SKYCHARGE. Green motion PIPISTREL SKYCHARGE 17 pagina's.
Ook voor Green motion PIPISTREL SKYCHARGE: Handleiding technische documentatie (15 pagina's)
SKYCHARGE – TECHNICAL DOCUMENTATION
Page 4
2 INSTALLATION
2.1 Mounting
Fix the charging station on the column requires a minimum of two people.
Fix the column on the concrete base with 4 threaded rods M10 according to the following diagram.
Do not forget the flat washers.
Electrical introduction is done through the left opening size 100x50mm with 1600 mm cable.
Bottom view:
Electrical introduction
Concrete base :
A concrete base have to be settled before
receiving the charger with the following
dimensions : 700 x 400 x 150 mm
Electrical cable