Kohler K-1127 Installatiehandleiding - Pagina 6
Blader online of download pdf Installatiehandleiding voor {categorie_naam} Kohler K-1127. Kohler K-1127 25 pagina's. Acrylic bath
Ook voor Kohler K-1127: Installatiehandleiding (25 pagina's), Installatie- en onderhoudshandleiding (29 pagina's), Installatie- en onderhoudshandleiding (25 pagina's), Inloophandleiding (4 pagina's)
Nail 1/4" (6 mm)
thick furring strips
to the studs.
Stud
Use #6 large-head galvanized
nails to secure the nailing-in
flange to the studs.
5. Secure the Bath to the Stud Framing
Drill a small pilot hole through the nailing–in flange at each stud location. Add shims between the
nailing-in flange and the studs as needed to eliminate any gaps.
Nail 1/4" (6 mm) thick furring strips to the studs to shim out to the edge of the nailing-in flange.
Use #6 large-head galvanized nails or screws to secure the nailing-in flange to the studs.
6. Install the Plumbing
CAUTION: Risk of personal injury. Bath rim-mounted faucets that may be inadvertently used as a
means of support are not appropriate or safe for this installation.
CAUTION: Risk of property damage. Make sure a watertight seal exists on all bath drain connections.
NOTE: Provide access to all plumbing connections to simplify future maintenance.
Connect the trap to the drain according to the drain manufacturer's instructions.
Install the faucet valving according to the faucet manufacturer's instructions. Do not install the
faucet trim at this time.
Open the hot and cold water supplies and check all connections for leaks.
Run water into the bath and check the drain connections for leaks.
Fill the bath to the overflow and check for leaks.
1016757-2-C
Drill a small hole through
the nailing-in flange at
each stud.
6
Kohler Co.