Kohler TOOBI II Series Handleiding voor installatie-instructies - Pagina 5
Blader online of download pdf Handleiding voor installatie-instructies voor {categorie_naam} Kohler TOOBI II Series. Kohler TOOBI II Series 6 pagina's. Vanity tops & cabinets
INSTALLATION
5
Waste & Tapware
(a) Fit the tapware. Connect the water supply
to the taps and waste pipe to the waste
outlet.
(b) Run hot and cold water and check for leaks.
When satisfied with the results move on to the
next section.
(c) Ensure the drain and faucet assembly is as
shown in Fig. 3.
P Trap
Fig. 3
6 Drawer re-installation
(a) To re-install the drawers, extend the runners
and place the drawer onto the runners.
(b) Gently push the drawer back until you hear
the runners click into place.
50%
Tap
Overflow
7 Sealing
Supply
Lines
(a) All edges MUST be sealed with an approved
Silicone Sealant.
- Between cabinet and wall
- Between the vanity top and wall
Drain
Assembly
Please visit our website for warranty information:
Kohler NZ
www.kohler.co.nz
-5-
INSTALLATION COMPLETE
Kohler Australia
www.kohler.com.au