AQC MAXIVIBE AMV-1140 Gebruikershandleiding - Pagina 11

Blader online of download pdf Gebruikershandleiding voor {categorie_naam} AQC MAXIVIBE AMV-1140. AQC MAXIVIBE AMV-1140 20 pagina's.

AQC MAXIVIBE AMV-1140 Gebruikershandleiding
Shaker type dust collector
10 DUCTING SYSTEMS
The dust collector should be installed as close as possible to the machines creating the dust.
This is to minimize the length of ductwork.
If possible, do not install short radius elbows or bends.
Install taps and branches having a 30 degree slope or less.
Do not install straight 90 degree taps (T's).
Join ductwork and branches using self tapping screws and silicone.

11 START-UP

11.1
Check list
Before starting the collector for the first time, the steps listed below should be followed to ensure
the collector will work properly.
Remove all objects in the vicinity of collector inlet and outlet.
Check for proper installation of all accessories and optional equipment.
11.2
Shaker system
Check if filter envelope upper frame is in place.
For automatic shaker systems, check if the connecting rod tied to the frame and reducer is
fixed and solid.
11.3
Electrical connection
Check if electrical connections are watertight and proper electrical current is provided.
Check if all remote controls (if supplied) are connected to the control panel and all switches
are at the "OFF" position.
Supply power to the collector.
Start the fan and shut it down immediately. Check motor rotation.
WARNING!
The electrical connection must be performed by a certified
electrician and by following the local building rules and
regulations. For safety measure, disconnect all electrical
power prior to installation.
11