Dell S4248FBL-ON Installatiehandleiding - Pagina 23

Blader online of download pdf Installatiehandleiding voor {categorie_naam} Dell S4248FBL-ON. Dell S4248FBL-ON 47 pagina's. S4200-on series
Ook voor Dell S4248FBL-ON: Installatiehandleiding (29 pagina's)

Dell S4248FBL-ON Installatiehandleiding
Figure 11. Two-post center-mount threaded round-hole installation
2
Slide the back bracket towards the post. Secure it with two user-supplied screws, see item 2.
3
Slide the front bracket forward against the front of the vertical post and secure it to the post flange with two user-supplied screws,
see item 3.
4
Repeat this procedure for the second rail.

Two-post center-mount installation

CAUTION:
Your switch is not NEBS Earthquake Z4-compliant if you this installation method.
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1
Slide the bracket rearward until it clicks into place and secure the rail bracket to the front of the post flange with two user-supplied
screws, item 1.
S4200-ON Series installation
23