Dell S4248FBL-ON Kurulum Kılavuzu - Sayfa 23
Anahtar Dell S4248FBL-ON için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Dell S4248FBL-ON 47 sayfaları. S4200-on series
Ayrıca Dell S4248FBL-ON için: Kurulum Kılavuzu (29 sayfalar)
Figure 11. Two-post center-mount threaded round-hole installation
2
Slide the back bracket towards the post. Secure it with two user-supplied screws, see item 2.
3
Slide the front bracket forward against the front of the vertical post and secure it to the post flange with two user-supplied screws,
see item 3.
4
Repeat this procedure for the second rail.
Two-post center-mount installation
CAUTION:
Your switch is not NEBS Earthquake Z4-compliant if you this installation method.
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1
Slide the bracket rearward until it clicks into place and secure the rail bracket to the front of the post flange with two user-supplied
screws, item 1.
S4200-ON Series installation
23