Dell S6000-ON Aan de slag handleiding - Pagina 21
Blader online of download pdf Aan de slag handleiding voor {categorie_naam} Dell S6000-ON. Dell S6000-ON 26 pagina's. Open networking
Ook voor Dell S6000-ON: Handleiding voor probleemoplossing (29 pagina's), Installatiehandleiding (41 pagina's)
Figure 4-4. Four-Post Threaded Configuration
Installing the Switch
You can mount the switch in the 1U front-rack or 1U two-post (flush and center)
configurations. The following is an example of a 1U front-rack configuration.
For the 1U two-post (flush and center) configurations, slide the switch into the
rails in the same manner as the four-post configurations.
1U Front-Rack Installation
Configure the rails that are attached to the switch.
1 Attach the switch rails (inner chassis members) to the S6000-ON switch.
Figure
4-5, item 3 shows the detail for the front standoff with the locking tab.
18
Installation