Dell S6000-ON Getting Started Manual - Page 21
Browse online or download pdf Getting Started Manual for Switch Dell S6000-ON. Dell S6000-ON 26 pages. Open networking
Also for Dell S6000-ON: Troubleshooting Manual (29 pages), Installation Manual (41 pages)

Figure 4-4. Four-Post Threaded Configuration
Installing the Switch
You can mount the switch in the 1U front-rack or 1U two-post (flush and center)
configurations. The following is an example of a 1U front-rack configuration.
For the 1U two-post (flush and center) configurations, slide the switch into the
rails in the same manner as the four-post configurations.
1U Front-Rack Installation
Configure the rails that are attached to the switch.
1 Attach the switch rails (inner chassis members) to the S6000-ON switch.
Figure
4-5, item 3 shows the detail for the front standoff with the locking tab.
18
Installation