Alloy LED PrimaLine Neon 200 TB Installatie-instructies - Pagina 4
Blader online of download pdf Installatie-instructies voor {categorie_naam} Alloy LED PrimaLine Neon 200 TB. Alloy LED PrimaLine Neon 200 TB 5 pagina's. 24v led tape light
®
®
f) Slide the white metal sleeve over the metal clamp to lock the
connection into place. The notches on the connector and metal
clamp should fit into the grooves of the white metal sleeve.
g) Slide the clear plastic cover over the white metal sleeve and tape
light to seal the connection.
2. Attach the DIY end cap to the opposite end of the
tape light.
Thread the clear cover onto the the end of the tape
light with the lip-end first.
Place the end cap in the same orientation as the
connector, and secure it to the tape light using the
metal clamp and sleeve in the same fashion.
www.AlloyLED.com
page 4 of 5
Installation Instructions
|
Call: 800.910.LEDS [5337]
Specifications subject to change without notice.
|
Text: 510.400.6690
|
v1