CREE LIGHTING IG Series Installatie-instructies

Blader online of download pdf Installatie-instructies voor {categorie_naam} CREE LIGHTING IG Series. CREE LIGHTING IG Series 2 pagina's. Led luminaire
Ook voor CREE LIGHTING IG Series: Installatie-instructies (3 pagina's)

CREE LIGHTING IG Series Installatie-instructies
IMPORTANT SAFEGUARDS
When using electrical equipment, basic safety precautions should
always be followed including the following:
READ AND FOLLOW ALL SAFETY
INSTRUCTIONS
1.
DANGER- Risk of shock- Disconnect power before installation.
DANGER – Risque de choc – Couper l'alimentation avant
l'installation.
SAVE THESE INSTRUCTIONS FOR
FUTURE REFERENCE
TO INSTALL:
1
Flange
BIRD GUARD MOUNTING
STEP 1:
Bring both halves of the bird guard together around the pendant as shown in Figure 1 and 2. Make sure that the flanges go under the non flange sides
This is needed for proper securing of the screws in the next step.
NOTE: There is one flange side on each half of the bird guard.
1 of 2
INSTALLATION INSTRUCTIONS
INSTRUCTIONS D'INSTALLATION
2
IG Series
LED Luminaire
Bird Guard
LPN00623X0001A0_B