CREE LIGHTING IG Series Kurulum Talimatları
Dış Mekan Işığı CREE LIGHTING IG Series için çevrimiçi göz atın veya pdf Kurulum Talimatları indirin. CREE LIGHTING IG Series 2 sayfaları. Led luminaire
Ayrıca CREE LIGHTING IG Series için: Kurulum Talimatları (3 sayfalar)
IMPORTANT SAFEGUARDS
When using electrical equipment, basic safety precautions should
always be followed including the following:
READ AND FOLLOW ALL SAFETY
INSTRUCTIONS
1.
DANGER- Risk of shock- Disconnect power before installation.
DANGER – Risque de choc – Couper l'alimentation avant
l'installation.
SAVE THESE INSTRUCTIONS FOR
FUTURE REFERENCE
TO INSTALL:
1
Flange
BIRD GUARD MOUNTING
STEP 1:
Bring both halves of the bird guard together around the pendant as shown in Figure 1 and 2. Make sure that the flanges go under the non flange sides
This is needed for proper securing of the screws in the next step.
NOTE: There is one flange side on each half of the bird guard.
1 of 2
INSTALLATION INSTRUCTIONS
INSTRUCTIONS D'INSTALLATION
2
IG Series
LED Luminaire
Bird Guard
LPN00623X0001A0_B