Epson OP1 Veiligheid en installatie - Pagina 22
Blader online of download pdf Veiligheid en installatie voor {categorie_naam} Epson OP1. Epson OP1 26 pagina's. Operator panel
Ook voor Epson OP1: Handmatig (44 pagina's)
2. Installation
(4) Secure the screws of the mounting
metal hasps.
Tighten the four screws slowly, in
an even, crisscross pattern.
Overtightening the screws may
damage the Operator Panel.
To ensure drip-proof performance,
the appropriate tightening torque is
0.5 Nm.
NOTE
Check the tightening torque again approximately 10 minutes after tightening the
screws.
14
OP1 Safety and Installation Rev.3