Alderon Industries Check It Panel Bedienings-, onderhouds- en installatiehandleiding - Pagina 4
Blader online of download pdf Bedienings-, onderhouds- en installatiehandleiding voor {categorie_naam} Alderon Industries Check It Panel. Alderon Industries Check It Panel 6 pagina's. 1 phase simplex demand dose
Check It Panel
1 Phase Simplex Demand Dose
Operation, Maintenance & Installation Manual
Check It Panel Self Diagnosing Instructions:
#1. Check the incoming power on the top of the command center.
#2. View the current status of your system. The indicator lights are illuminated as each float rises
#1.
All three floats are not activated. Only the Control
Power and Alarm Power indicator lights should be
illuminated.
#3.
The Stop float and the Start float are activated so the
Stop float and the Start float indicator lights are
illuminated.
TM
Fuses are good.
If one or both of the indicators are
not illuminated the fuse or fuses
need to be replaced. If the fuse or
fuses do not fix the problem the
incoming power needs to be
examined.
Alarm Float
Start Float
Stop Float
Alarm Float
Start Float
Stop Float
If the indicator lights are illuminated the fuses are good.
Alarm Fuse needs
to be replaced
with the liquid level in the tank.
Alarm Float
Start Float
Stop Float
If the Stop float is activated the Stop light will illuminate.
Alarm Float
Start Float
Stop Float
All floats are up so all indicators are illuminated.
Control Fuse needs
to be replaced
#2.
#4.
P/N L1153
Page 4 of 6