Etac Molift MRS Quattro Installatiehandleiding - Pagina 7

Blader online of download pdf Installatiehandleiding voor {categorie_naam} Etac Molift MRS Quattro. Etac Molift MRS Quattro 16 pagina's.

6. Attach booms with mounted corners on to
the other two boom.
7. Tighten all the bolts and nuts with a spanner.
8. Make sure all bolts are properly thightened.
Secure that bolts are thightened prop-
erly. Loose bolts may cause collapse of
the Quattro when it is raised!
Assembly

Tip: Perpendicular frame.

If possible, use a tape measure to check that the
Quattro Frame is perpendicular.
1. Measure the diagonal length corner-to-corner.
The length shall be the same both ways.
2. If not; loosen the bolts and adjust.
3. When the readings is the same the frame is
square (or rectangle).
4. Tighten all bolts and nuts.
Warning for lifting of heavy loads.
Dropping the frame can cause
injury.
Mounting of legs, Ceiling height > 2,4 meter
1. Lift the Quattro frame at one side and fit legs
in the corners.
2. Use an Allen key to tighten the bolts for
fastening the legs
Note! Secure the boom and trolley
from running free. Use a strap or
tape.
6
Molift MRS Quattro / www.etac.com