Air & Allied Sales MP55AK Instrukcja obsługi - Strona 8
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Narzędzia Air & Allied Sales MP55AK. Air & Allied Sales MP55AK 11 stron. Air nipper
・The replacement procedure of a lever
(1) Intercept an air source of supply.
(2) Remove an air hose from a main part. (Refer to Fig. 1)
(3) Remove hook(⑲). (Refer to Fig. 3)
(4) Pull out roll pin(⑯) using pin omission, and remove lever(⑧). (Refer to Fig. 4)
(5) New lever(⑧) is set, insert roll pin(⑯), hit the head lightly, and make it come out equally.
(6) Hook(⑲) is attached.
(7) Thrust adjustable screw B(27) into the lower part by a wrench to the place
which hits lightly, and make it fix with nuts(28).
※Keep in mind that the safe stopper of a lever stops working
(8)From a nipple(⑰), air is put in and a valve switch(41) is opened.
※Be sure to remove blades from a main part for dangerous prevention at this time.
(9)Adjustable screw A is thrust by a wrench in the state of lever-on.
Although air leaks from near air pin (④) on the way, if it thrusts as it is, an air leak will stop.
Please let me fix with nuts(28) in the position at which the air leak stopped.
※When you make (28) fix, be careful for an adjustable screw not to turn simultaneously.
Attachment of a lever is completion above.
Fig. 3
Fig. 4
●Where a lever is pushed in completely, when there is an air leak from an air pin part
Exchange of air pin(④) (with O ring) is required.
・The exchange method of air pin(④)
(1) Intercept an air source of supply.
(2) Remove an air hose from a main part. (Refer to Fig. 1)
(3) Remove hook(⑲). (Refer to Fig. 3)
(4) Pull out roll pin(⑯) using pin omission. (Refer to Fig. 4)
(5) Remove lever(⑧) and exchange air pin (④) (with O ring).
(6)Attach a lever(⑧) , roll pin(⑯) , hook(⑲), and complete.
8/11
Air & Allied Sales (Pacific) Pty Ltd
www.air-allied.com.au