Amerisolar Wolfram-BAT-10.24 Instrukcja instalacji - Strona 18

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Akcesoria do kamer Amerisolar Wolfram-BAT-10.24. Amerisolar Wolfram-BAT-10.24 20 stron.

Worldwide Energy and Manufacturing USA Co., Limited
Note:
•Must be operated by professionals;
•When connecting the communication harness, avoid incorrect connection of the
communication port;
•When connecting in parallel, it is strictly forbidden to touch the total positive and negative
poles of the battery pack at the same time to avoid high voltage damage;
•During installation, the circuit breaker should be placed in the off state.
Step 5: Close the cabinet door
After completing the above steps, close the cabinet door.
Step 6: Connect the battery system and the inverter
Connect the power cables and communication cables from the cabinet to the inverter as
shown in the figure below.
Figure 14. connection between battery system and PCS

5. Operating

5.1 Boot Up

Precaution: Before starting up, please make sure that the cabinet has been correctly
installed and connected Boot steps:
•Open the cabinet door;
•Press the black button on the two battery boxes to the closed state, and then press and hold
the red soft start button of either battery box for 3 seconds. All the panel indicators flash once
and then the green operation indicator flashes at 2 second intervals, indicating that the
system is booting normally;
•After confirming that the positive and negative poles of the cabinet output have been
correctly connected to the inverter or after insulation treatment, close the two circuit breakers
on the cabinet;
•Close the cabinet door and start the machine.

5.2 Shutdown

Note: Before disconnecting the cabinet to the inverter, make sure that the battery system
is turned off.
Shutdown steps:
16