Amerisolar Wolfram-BAT-10.24 Instrukcja instalacji - Strona 19
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Akcesoria do kamer Amerisolar Wolfram-BAT-10.24. Amerisolar Wolfram-BAT-10.24 20 stron.
Worldwide Energy and Manufacturing USA Co., Limited
•First disconnect the circuit breaker on the cabinet;
•Open the cabinet door, press and hold the red soft start button of any battery box for 3
seconds, all the indicators on the panel will be on;
•Release the red button and the indicator light goes out;
•Press the black buttons of the two battery boxes to the disconnected state;
•Close the cabinet door and the shutdown is complete.
6. Maintenance
•Battery maintenance must be performed by professionals;
•If the battery is stored continuously for more than three months, it must be fully charged
once;
•Every three months, check whether the connections of battery communication and power
cables are loose.
7. Troubleshooting
Troubleshooting can only be performed by professionals. Before checking for faults, you must
check whether all cable connections and circuit breakers are in the correct state.
Serial
Malfunction
Numbe
Communicati
1
on failure
2
Unable to boot
3
SOC abnormal
8. Interpretation of Abbreviated Words
FPC
BMS
BMU
BOL
Bus-bar
CAN
EOL
HV
LV
OCV
Table 7. common faults
Check whether the communication line is loose, and check
whether the BMS communication protocol matches the
Use a charging device to charge the battery. If it still cannot
be turned on, please contact for maintenance.
Turn off the soft start switch when shutting down, and
then turn off the power switch after 1 second.
Flexible printed circuit
Battery management system
Battery management unit
Begin of life
Cell pole connecting strip
Controller area network
End of life
High voltage
Low voltage
Open circuit voltage
17
Solution