Cansec H1000 Instrukcja instalacji - Strona 7
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Kontroler Cansec H1000. Cansec H1000 20 stron. Elevator control
See Hurricane Operator Guide for more information.
Edit->Panel Definitions. Select 32, 48, 64 Floor Elevator Board.
Edit->Elevator Sets. Select 32 Floors.
48 FLOOR ELEVATOR SYSTEM
This configuration is used when connecting to an elevator of up to 48 floors. This consists of
three H1000 control panels, designated as a master panel and a two slave panels.
Master
Master Panel: Controls floor 1 to 16
RS485 Communication wires to host computer using Cansec
communication line driver e.g. CLAUSB, Canlan or Air-485
Master and slave RS485 communication wires
Slave 1
Slave Panel 1: Controls floor 17 to 32
H1000 Elevator Control
Installation Guide
Slave 2
Slave Panel 2: Controls floor 33 to 48
Page 7 of 20
October 2015 • Rev. 1.7