Douglas Dynamics SnowEx Brine Pro 2000 Podręcznik - Strona 4

Przeglądaj online lub pobierz pdf Podręcznik dla Pompa wodna Douglas Dynamics SnowEx Brine Pro 2000. Douglas Dynamics SnowEx Brine Pro 2000 10 stron. Gas engine transfer pump, brine maker

TPS-200

INSTALLATION INSTRUCTIONS

CAUTION
Read this document before installing the Gas
Engine Transfer Pump.
CAUTION
Use standard methods and practices when
installing equipment, including proper
personal protective safety equipment.
Disassembly Instructions
1. Remove the 10 body screws, lock washers, and
nuts from the pump assembly. Remove the body
from the pump assembly. Save all for later use.
Remove the
body screws,
lock washers,
and nuts.
Pump
Body
Lit. No. 11814, Rev. 00
2. Remove the check valve from the volute. Remove
the one upper and two lower volute screws, and
remove the volute. Save all for later use.
Check
Valve
Lower
Volute
Screws
3. Remove the impeller bolt from the impeller and
discard. Remove the impeller and keyshaft
carefully, using a pry bar if necessary. Save for
later use.
Remove
body screws,
lock washers,
and nuts.
Impeller
Bolt
4
Upper
Volute
Screw
Impeller
Volute
October 1, 2017