Follett Horizon HCE1000AJS Instrukcja instalacji - Strona 6

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Kostkarka do lodu Follett Horizon HCE1000AJS. Follett Horizon HCE1000AJS 17 stron. For drop-in satellite-fill applications

Follett Horizon HCE1000AJS Instrukcja instalacji
Prepare the dispenser.
2.1
3.1

Dispenser preparation

4"
(101,6mm)
• Determine best route for ice transport tube run. Note: 12" (304,8mm) clearance is required.
• Drill 1 3/4" (44,5mm) hole through either side of dispenser
• Install gasket
• Attach bulkhead fitting with flat up
• Position and secure nut locking plate
• Verify installation of O-ring on stainless steel ice transport tube coupling
• Insert stainless steel ice transport tube coupling
coupling cap
• Soften ice transport tube with hot water (160 F (71 C)) to ease assembly
• Attach ice transport tube to coupling with supplied hose clamp
6
onto bulkhead fitting
and tighten bulkhead nut
Dispenser preparation
with supplied screws
into bulkhead fitting and secure with
DROP-IN • SATELLITE-FILL
self-contained
Hot Water
12"
(304,8mm)
min.
3