Ampro ReadyPanel 6.5 Podręcznik użytkownika - Strona 7
Przeglądaj online lub pobierz pdf Podręcznik użytkownika dla Sprzęt komputerowy Ampro ReadyPanel 6.5. Ampro ReadyPanel 6.5 20 stron.
Chapter 1
Preparations
1) Open shipping box.
2) Verify contents.
3) Verify support
documentation.
(ReadyBoard Support
Software CD-ROM
located in the first
QuickStart Kit)
Setting Up the Work Space
CAUTION
4) Select workbench
location.
5) Unpack ReadyPanel.
ReadyPanel
•
Locate the ReadyPanel Contents List. See
•
Unpack the contents of the shipping box.
•
Verify the contents of the shipping box against the Contents List included
with your ReadyPanel shipping box.
•
If anything is missing or damaged, call your sales representative. Refer to
the Ampro web site at www.ampro.com for contact information.
ReadyPanel User's Guide
This document describes how to set up and power up the ReadyPanel and is
provided on the ReadyBoard Support Software CD-ROM as a PDF file.
ReadyBoard Reference Manual
This document provides detailed reference information on the ReadyBoard
and is located on the ReadyBoard Support Software CD-ROM as a PDF file.
ReadyBoard QuickStart Guide
This document describes how to set up, install, and power up the ReadyBoard
installed inside the ReadyPanel enclosure and is located on the ReadyBoard
Support Software CD-ROM as a PDF file.
Operating System Manual(s)
These documents describe how to use the desired operating system (OS) with
the ReadyPanel and provide more detailed programming and operating
information. These documents may or may not be provided with ReadyPanel
depending on the specific licensing requirements.
To prevent damage to the ReadyPanel, ensure sufficient clearance exists
around the air vents for unrestricted airflow.
The air temperature inside the enclosure could rise above the specified
operating temperature limits if the airflow through the vents is restricted.
•
The workbench location should be a flat clean surface for setup and operation
(including the connection of any external peripherals and optional devices).
•
Ensure sufficient airflow clearance exists around the complete enclosure.
•
Make sure to integrate mounting hardware or a method of tilting the Ready-
Board to one side to allow clearance for the cooling fan.
•
Remove the ReadyPanel from its shipping container and place it on a flat work
surface.
The ReadyBoard and the ReadyPanel enclosure—with the desired OS pre-
installed—form a complete system ready for operation.
User's Guide
ReadyPanel Setup
Figure
1-1.
3