Anchor VMS 25x32 Instrukcja montażu - Strona 6
Przeglądaj online lub pobierz pdf Instrukcja montażu dla Namiot Anchor VMS 25x32. Anchor VMS 25x32 16 stron. Vehicle maintenance shelter 25' x 32' with extension kits
STEP 2 - Top Frame Assembly
• Lay out parts as shown. See Figure 2.
•
Peak weldments have yellow/orange color, eave weldments are silver/zinc colored.
•
Rafters have angled cuts on both ends. The end with the label assembles to the peak. (See Ridge Detail on Figure 2).
The end with no label assembles to the eave.
•
Assemble the (3) Top Arches consisting of peak weldments with the corresponding rafters, eave weldments and ridge
braces
•
Ensure that the End Arches are comprised of end weldments and end rafters. (Brackets on one side only.) Use the pins to
secure the joints.
•
Connect the (3) arches with 10 purlins using pins adjacent to the brackets.
Important: For ease of installation, note that labels are always located on the upper ends of frame members.
Note: For installation of frames with extension kits, lay out
each extension's parts as shown in these diagrams.
6
Ridge
purlin
Rafter
Label at upper
ends of rafters
Peak End
12
Weldment
Figure 2