3onedata ES1026-2F Instrukcja szybkiej instalacji
Przeglądaj online lub pobierz pdf Instrukcja szybkiej instalacji dla Przełącznik 3onedata ES1026-2F. 3onedata ES1026-2F 2 stron. Unmanaged ethernet switch
ES1026-2F
Unmanaged Ethernet Switch
Quick Installation Guide
3onedata Co., Ltd.
Address:
3/B, Zone 1, Baiwangxin High Technology
Industrial Park, Song Bai Road, Nanshan
District, Shenzhen, 518108, China
Website:
www.3onedata.com
Tel:
+86 0755-26702688
Fax:
+86 0755-26703485
【Package Checklist】
Please check the integrity of package and accessories while
first using the switch.
1.
Industrial Ethernet switch X 1
3.
Power line
5.
Quick installation guide
If any of these items are damaged or lost, please contact our
company or dealers, we will solve it ASAP.
【Product Overview】
This product is 26-port 100M rack-mounted unmanaged
Ethernet switches. Model is: ES1026 (24 100M copper ports +
2 100M fiber ports)
【Panel Design】
Front view
Rear view
Top view
Left view
Right view
1.
2.
Terminal block
2.
4.
Certification
3.
6.
Warranty card
4.
5.
6.
7.
【Mounting Dimension】
Unit: mm
Port indicator
Power supply input status indicator PWR
Device running status indicator RUN
Rack mounting lug
Power input terminal block
100M fiber port
100M copper port
Attention before mounting:
Don't place or install the device in moist area or near
water, keep the relative humidity of the device
surrounding between 5%~95% without condensation.
Before power on, first confirm the supported power
supply specification to avoid over-voltage damaging the
device.
The device surface temperature is high after running,
please don't directly contact to avoid scalding.
【Installation of Rack-mounted Device】
Step 1
Select the device installation location to reserve