Anzzi L-AZ 905 Series Instrukcja instalacji i obsługi - Strona 6

Przeglądaj online lub pobierz pdf Instrukcja instalacji i obsługi dla Produkt hydrauliczny Anzzi L-AZ 905 Series. Anzzi L-AZ 905 Series 8 stron. 2 tone lavatory faucet

INSTALLATION
3
[16]
outlet
STEP 3:
Connect the Hoses [16] to the outlets of Valve
Assembly [09].
5
HOT
STEP 5:
1.
Turn on hot and cold water supplies and turn the Handles [06], then check all connections at arrows for
leaks. Retighten if necessary, but Do Not Overtighten.
Using the Key [05], remove Aerator [02] from Spout [01].
2.
3.
Turn the Handles[06] to full on position and flush water lines for one minute. Reinstall Aerator [02] with the
Key [05].
4
outlet
STEP 4:
Use hoses or copper tubes(NOT PROVIDED) to
connect the inlets of Valve Assembly [09] and the
Hot and Cold water supplies. Hand tighten the nuts
and tighten with wrench to secure.
[06]
COLD
inlet
hose or
copper
tube
HOT
[02]
[05]
inlet
COLD
[01]
PG.4