ROOF ASSEMBLY
SELECT:
5 x 2.200 m Roof Sheets
1 x 2.200 m 1 Pan Roof Sheet
2 x 2.725 m Spouting
4 x 1.102 m Barges
2 x 1.555 m Ridge Cap
1 x 2.690 m Ridge Beam
2 x 0.200 m Jack Studs
8 x 75mm Screws
37 x 55mm Roofing Screws
66 x Rivets
4 x 50mm Clouts
STEP 1:
• Place the Ridge Beam on a level surface and use 2 x 75mm
screws to secure the Jack Studs to the underside of the Ridge
Beam, one at each end (fig. 1).
• Turn the Ridge Beam /Jack Stud assembly over and place it on
the timber Top Plate in a central position.
• Secure with 2 x 75mm screws through the top of the Jack Studs
into the Timber Top Plate (fig. 2).
STEP 2:
• Position the first roof sheet with the centre slots over the
middle of the Ridge Beam. Gently fold the roof sheet over
the Ridge Beam so that the ends touch the front & back Top
Plates.
• Repeat with second roof sheet.
• Rivet sheets together at overlaps ,one rivet either side of the
ridge beam (fig. 3).
• Repeat with remaining roof sheets
IMPORTANT—FOR SHEDS WITH OPTIONAL CLEAR
ROOF PANEL
Assemble as below, making sure that the Clear Roof Sheets
overlap the standard roof sheets on both sides.
The Clear Roof Panel must be secured to the Top Plate and the
Ridge Beam. Pre drill and fasten with the 55mm roofing screws
provided..
SIDE
WALL
12
fig. 1
fig. 2
RIDGE BEAM
JACK STUD
TOP PLATE
fig. 3
TOP PLATE
BACK
WALL
BOTTOM PLATE
SIDE
WALL
RIDGE BEAM
FRONT
WALL