Note:
For sheds with the Raised Floor Modification option the studs will be 1.780m long to allow the Wall Sheets to pro-
trude 20mm below the Bottom Plate. Refer to Raised Floor Modification section (Page 15).
Note:
Studs and Nogs surrounding a window opening are to be fitted once the wall cladding is nailed in place.
Step 1: End Walls: Select one 1.210m End Base Plate
(Green), one 1.210m End Top Plate (Red) and
two Studs (Yellow). Lay out Plates and two Studs
on a flat surface and nail together using two
75mm nails per join. Position 1.120m Nog .883m
down from Top Plate and nail in place. Repeat
with other end wall.
Step 2: Select one 1.715m Base Plate (Green), one
1.715m Top Plate (Red). Stand up End frame
with the Stud side of the frame on the ground.
Nail 1.715m plates to frame using two nails per
join. Ensure Green joins to Green and Red joins
to Red. Repeat with other end frame. Position
1.625m Back Wall Nog .883m down from the
Top Plate and nail in place.
Step 3: Select one 1.715m Base Plate (Green) and the
Ridge Beam (90 x 45). Nail in place. Ensure
Green joins to Green.
Step 4: Carefully roll the frame over so that the Ridge
Beam and Base Plate (Green) are on the
ground. Select a stud (Yellow) and one .785m
Nog. Nail in Stud using the .785m nog to get the
correct
position
nog .883m down from the Top Plate and nail in
place.
Step 5: Carefully roll frame over onto its base. If fitting a
Kiwi Floor, fit Floor Joists now. Place the joist
centrally and nail in place using three 75mm nails
per end.
KL1 TIMBER FRAME
top
and
bottom.
Position
1
2
3
4
5
5