4B Shade 2 Instrukcja instalacji - Strona 7

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Akcesoria samochodowe 4B Shade 2. 4B Shade 2 8 stron.

4B SHADE II
Connecting the Inner Tube Bars to the Fabric Bottom Bar
14
Position the Fabric Bottom Bar in line with the pre-drilled hole of the Inner Tube Bars.
Mark and drill through the Fabric Bottom Bar using a 8.5mm bit.
HINT – Drill close to the outer edge as possible note measure (Fig 1). End cap will be fitted.
NOTE – Drill hole at the front of the bar – away from the fabric.
15
Position the nut inside the Inner Tube in line with the hole ready to receive the bolt. (FIG. J)
Place cap over pre drilled hole in Inner Tube, facing upwards. (FIG K)
17
Place the bolt downward through the hole picking up the nut positioned in the Inner Tube Bar. (FIG. L)
COMPONENTS
INITIAL OPERATION / TESTING YOUR NEW 4B SHADE
NOTE -
There should be a degree of resistance when first operating the 4B Shade.
This will reduce the more the 4B Shade is put to use.
Metal shavings from the end of the Outer Tube bars are normal and will decrease in time.
We do recommend you wipe the area clean after each initial use.
Pulling the bar in and out 'MUST' be done with equal tension on both bars.
PULL out evenly from the centre with One Long Motion.
Regularly check all nuts and bolts are tensioned and always prior to Outback travelling.
Gripping the handle – pull the 4B Shade outwards keeping the both bars level and even.
4B Shade extends 1.8 Mtrs comfortably and can be secured (if required) at this extension using 2 pins
RETRACTING – Gently lift the handle while gently pushing the 4B Shade back into the cassette.
The 4B Shade should be used foremost as a 'Shade' and for light rain protection.
Drive towards the Sun –
.6.
FIG. I
NOTE – Cap
18mm
Will be installed
One Long Motion
In the pre-drilled holes.
BEST SHADE OPERATION –
STOP – Pull out the 4B Shade – Perfect Shade!
FIG. J
FIG. K
Completed installation
Of Inner Tube bars to Front
Fabric bar.
FIG. L