CB2 chill Instrukcja montażu - Strona 2

Przeglądaj online lub pobierz pdf Instrukcja montażu dla Wyposażenie wnętrz CB2 chill. CB2 chill 6 stron. Large media console
Również dla CB2 chill: Instrukcja montażu (4 strony)

CB2 chill Instrukcja montażu
chill
MEDIA CONSOLE
NOTE: Do not over
tighten the cam
screws
middle
A
panel
A. Insert 2 cam screws, 2 wood dowels and 4
cams into middle panel as shown. Secure, but do
not over tighten, cam screws with a phillips head
screwdriver. Make sure arrows on each cam point
toward nearest edge with holes.
B. Insert 4 cam screws, 6 wood dowels and 2
1
cams into left and right side panels as shown.
A
top panel
bottom
B
panel
A. Insert 8 wood dowels and 8 cam screws into
top panel as shown.
3
B. Insert 4 cams into bottom panel as shown.
Made in Vietnam - r09
NOTE: Make sure arrows
on each cam point toward
nearest edge with holes
left and right
B
side panels
Customer Service 800.606.6252 | Latest instructions available at www.cb2.com
top partition
bottom
partition
A. Insert 2 wood dowels and 2 cams into top
partitions as shown.
B. Insert 2 dowels and 2 cams into bottom
2
partition as shown.
NOTE: Do not over
tighten the bolts
top partition
Fit dowels of top partitions into corresponding
holes of middle panel as shown. Secure middle
panel with 4 bolts, 4 spring washers, and 4 flat
washers, using a phillips head screwdriver. Do
4
not over tighten the bolts.
middle panel
top partition
Page 2 of 6