Aircommand HERON 2.2 Instrukcja obsługi - Strona 8

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Klimatyzator Aircommand HERON 2.2. Aircommand HERON 2.2 17 stron.
Również dla Aircommand HERON 2.2: Instrukcja instalacji (10 strony)

Aircommand HERON 2.2 Instrukcja obsługi

Now Install the Air Handler

Insert the A/H into the front panel, and shift to the right as far as possible such that the right hand
flange is fully over the front panel. Now insert a screw to hold the A/H in place while the copper tubes
are manipulated to line up with the respective nipples.
Mark any excess tube to be cut off, and remove the A/H to allow the flare nuts to be put on and the
flares made. Unscrew both flare nuts from the nipples of the A/H, ensuring the sealing caps are
removed.
See page 6 for tips on making flares.
Having completed the flaring, reinstall the A/H, remembering to shift it fully to the right after insertion.
Couple the flare nut connections and do up firmly.

INSTALL BITUMINOUS TAPE AROUND 9.5 FLARE NUT AT THE A/H.

From the Installation kit provided, take the length of bituminous tape and wrap it around the
and joining the foam rubber insulation already on the pipe. The purpose of this is to avoid formation of
condensate, which may drip into the cupboard. Install control plate.
Never ever use thread sealing compounds on the flare as possible system contamination can occur and a
blockage may result.

INSTALL CONTROL PANEL.

1. Plug service lead into power point but leave the
power turned off (see fig 14)
2. Plug the condenser set control cable (3 pin plug)
and the Air Handler control cable (8 pin plug) into
their respective sockets at the back of the switch
box (see fig 15).
3. Turn power point on.
4. Push control panel flush against the face of the
cupboard and then slide to the right to engage
with the fascia panel. Hold the control panel in
place with two screws. Cover screw heads with the
caps provided. (see fig 16)
5
/
flare nut
3
8
Figure 14
Figure 15
Figure 16