Use this instruction
If 30 Amp circuit breaker is available in customer Main Breaker Panel.
ES-10 is designed for use with Main Breaker Panel Three Phase 120/208V AC WYE
Connection, up to 200 Ampere.
ES-10 unit should be mounted with four appropriate sized fasteners before connect to
Main Breaker Panel.
1.1 Power Connections
1.11 Remove the Panel cover of ES-10 exposing internal connections.
1.12 Locate Earth Terminal in ES-10, connect the earth wire to ES-10 Earth Terminal. Connect the other
side of earth wire to main breaker panel ground rod. Ensure all mechanical connections are secure
and making full contact.
1.13 Locate existing 3 Pole 30 Amp Circuit Breaker in the Main Breaker Panel.
(a) Connect the wire L1 to Phase 1 of 30 Amp circuit breaker.
(b) Connect the wire L2 to Phase 2 of 30 Amp circuit breaker
(C) Connect the wire L1 to Phase 3 of 30 Amp circuit breaker.
(d) Connect the Neutral from Neutral Bar.
1.14 Qualified Representative must inspect size of cable 10 AWG.
1.15 Connect power cables to T1 Terminal Block of ES-10.
1.2 Current Sensor Connections
1.21 Open one side of all 3 Split CT (Current Sensor). Clip the CT one by one on the wire L1, L2 & L3
before main Circuit Breaker Panel as shown in figure-1 page 6.
1.22 Locate Terminal Block T2 (S1-S2), T3 (S3-S4) & T4 (S5-S6) in ES-10.
1.23 Qualified Representative line side of Main Panel should connect the wires from:-
(a) External CT on L1 to T2 (S1-S2).
(b) External CT on L1 to T3 (S3-S4).
(c) External CT on L1 to T4 (S5-S6), preferably twisted.
1.24 Firmly secure current sensor to line side (L1, L2 & L3) of main circuit breaker.