high pointe 50F11 Instrukcja obsługi - Strona 3
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Okap wentylacyjny high pointe 50F11. high pointe 50F11 4 stron.
INSTALLATION
Mark centerline of range on wall and underside of cabinet and measure 5" from each side of
1)
centerline on wall.
Cut 10" x 2 7/8" hole located 1 13/16" down from rear cabinet edge, centered left to right with
2)
range centerline through wall.
Route electrical supply wire through opening and attach proper connector for type of wire
3)
used.
Attach extension duct to hood outlet if needed and insert duct into wall opening and attach
4)
hood to underside of cabinet with screws of sufficient length through the four (4) mounting
holes.
NOTE: Make all electrical supply connections in accordance with local and/or applicable codes.
Remove the single screw holding the wiring compartment cover in place. Connect white to
5)
white, black to black and attach bonding wire to green ground screw provided. Replace
wiring compartment cover by inserting tab on cover into the slot located on side of blower
housing and re-attach screw. Make sure all wiring is safely enclosed inside compartment.
Verify that blower housing and ductwork are free of debris and that fan blade spins freely.
6)
Install a suitable outside wall vent per manufacturers instructions if instructions are
provided.
Note: The range hood must be placed at a minimum distance of 20" above the
of a hob. If the total wall thickness requires the use of a duct extension, use C0157 as per
below.
BOTTOM OF
CABINET
WHITE
CENTERLINE
OF RANGE
10"
BLACK
WIRE
(+)
GROUND
WIRE
WIRE
(-)
GROUND
SCREW
17"
11
"
16
3
1
"
16
1
4
"
8
7
3
2
"
4
"
8
4
2"
6"
10"
2
cooking surface
3
4
"
4
20"/22"/24"
Min. 20"
Max. 30"