CORA CBL-DT Instrukcja instalacji i montażu - Strona 9

Przeglądaj online lub pobierz pdf Instrukcja instalacji i montażu dla Stojaki i stojaki CORA CBL-DT. CORA CBL-DT 20 stron. Bike rack - double tier locker

Locker Installation & Assembly Instructions
Cora Bike Rack - Double Tier Locker (CBL-DT)
13. Attach side panels onto one side of bottom locker
14. Place assembled sliding upper tier frame onto bottom locker
• Lift the assembled sliding upper tier
on to the partially assembled base frame.
Cora Bike Rack - Australia's Bike Parking Experts - WWW.CORA.COM.AU - PH 1800 249 878
• Screw 1 set (x2) of side panels (second set of
bottom side panels to be attached in step 21). Side
panels will attach to base frame, end frames and posts
• Side panels must be attached from the inside of the
locker using phillips head fasteners and washers
total 8 screws and washers per panel (x2) at bottom
(x3) at each side
Rev 1.00 Dec 2020
©