Galvin Specialised Ezy-Drink Lead Safe 316 SS TD15XEM Instrukcja instalacji produktu - Strona 3
Przeglądaj online lub pobierz pdf Instrukcja instalacji produktu dla Produkt hydrauliczny Galvin Specialised Ezy-Drink Lead Safe 316 SS TD15XEM. Galvin Specialised Ezy-Drink Lead Safe 316 SS TD15XEM 4 stron. Remote electronic drinking bubbler tap
3. Fit Piezo Button
Install piezo button through the trough
ensuring that the coloured washer is in
place.
Fit & tighten the supplied nut.
Connect it to the electronic control unit.
Water
Supply
5. Fit Solenoid and Hose
Fit flexi hose to solenoid and water supply.
Fit flexi hose to outlet.
Version 1, 7 February 2020, Page 3 of 4
4. Install Piezo Button, Solenoid and Transformer
Connect Piezo button, the solenoid & the power supply
to the eletronic control unit.
This unit is supplied with 2 x 3.2 metre extension leads
for connecting to the power supply and solenoid.
6. Testing
Once the drinking tap has been installed and tested
for leaks, the water height may be adjusted to suit the
available pressure.
To adjust water flow
1. Remove the blanking screw.
2. Adjust the water height by turning the regulator
screw.
3. Replace blanking screw.
Note: The full range from minimum flow to
maximum flow is only ¼ turn.