Gamma Progression Els Instrukcja obsługi - Strona 11
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Maszyny naciągowe Gamma Progression Els. Gamma Progression Els 19 stron.
Również dla Gamma Progression Els: Instrukcja obsługi (20 strony), Instrukcja obsługi (20 strony)
STRINGING THE FRAME
Weaving the Cross Strings
Weave the cross strings over and under the
main strings being careful to alternate the
weave direction of each consecutive cross
string so as to be opposite of the previously
installed cross string.
Completing the String Job
Once the final cross string is tensioned and
clamped, tie off at the appropriate hole speci-
fied by the racquet manufacturer. Remove
the frame from the mounting system by
loosening the shoulder supports and frame
supports.
10