Gamma Progression Els Panduan Pemilik - Halaman 11
Jelajahi secara online atau unduh pdf Panduan Pemilik untuk Mesin Merangkai Gamma Progression Els. Gamma Progression Els 19 halaman.
Juga untuk Gamma Progression Els: Panduan Pemilik (20 halaman), Panduan Pemilik (20 halaman)
STRINGING THE FRAME
Weaving the Cross Strings
Weave the cross strings over and under the
main strings being careful to alternate the
weave direction of each consecutive cross
string so as to be opposite of the previously
installed cross string.
Completing the String Job
Once the final cross string is tensioned and
clamped, tie off at the appropriate hole speci-
fied by the racquet manufacturer. Remove
the frame from the mounting system by
loosening the shoulder supports and frame
supports.
10