Green Air Designs Su-27 Flanker Instrukcja obsługi - Strona 2

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Zabawka Green Air Designs Su-27 Flanker. Green Air Designs Su-27 Flanker 17 stron.

Step 1 – Basic Fuse Construction
Refer to Drawings on page "step one" for basic build.
1. Glue the carbon tube/Ally Box spar in to wing slot (trim to length If
required).
2. Shape wing to aerofoil (shown on wing shaping page).
3. Dry fit fuse parts FB1, FB2, and wing.
4. Lay F2, F3 and F4 on to place using drawings provided, and check for
alignment.
5. When happy, glue, or use the glueless method, the parts into place.
6. Rough shape the lifting section to shape shown.
What we are attempting to do here is to build the model into modules for
assembly later. It is also a good idea to sand the majority of shapes in when
building the modules so less shaping is required later.