Dell S4100-ON Series Instrukcja instalacji - Strona 17
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Przełącznik Dell S4100-ON Series. Dell S4100-ON Series 48 stron.
Również dla Dell S4100-ON Series: Instrukcja instalacji (47 strony), Instrukcja konfiguracji (21 strony), Instrukcja instalacji (49 strony)
The S4100–ON Series (S4128F-ON, S4148F-ON, and S4148FE-ON) is suitable for installation as part of a common bond network (CBN).
You can install the switch in:
•
Network telecommunication facilities
•
Data centers
•
Other locations where the National Electric Code (NEC) applies
For more information about the S4100–ON Series specifications, see Specifications.
NOTE:
Install the switch into a rack or cabinet before installing any optional components.
Topics:
•
Site selection
•
Cabinet placement
•
Rack mounting
•
Switch ground
•
Fans and airflow
•
Power
•
Storing components
Site selection
Install Dell EMC equipment in restricted access areas.
A restricted access area is one where service personnel can only gain access using a special tool, lock, key, or other means of security. The
authority responsible for the location controls access to the restricted area.
Ensure that the area where you install switch meets the following safety requirements:
•
Near an adequate power source. Connect the switch to the appropriate branch circuit protection according to your local electrical
codes.
•
Environmental—switch location—continuous temperature range is from 50° to 104°F (from 5° to 40°C).
•
Operating humidity is from 5 to 85 percent noncondensing, continuous.
•
In a dry, clean, well-ventilated, and temperature-controlled room, away from heat sources such as hot cooling vents or direct sunlight.
•
Away from sources of severe electromagnetic noise.
•
Inside the restricted access area, position in a rack or cabinet, or on a desktop with adequate space in the front, back, and sides for
proper ventilation and access.
•
Install the switch in Information Technology Rooms in accordance with Article 645 of the National Electrical Code and NFPA 75.
For more information about switch storage and environmental temperatures, see Specifications.
Site preparations
Site preparations
3
17