Dell S4248FB-ON Instrukcja instalacji - Strona 19

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Przełącznik Dell S4248FB-ON. Dell S4248FB-ON 47 stron. S4200-on series
Również dla Dell S4248FB-ON: Instrukcja konfiguracji (29 strony)

Dell S4248FB-ON Instrukcja instalacji
To install the S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch, complete the installation procedures in the order presented in
this section.
Always handle the switch and its components with care. Avoid dropping the switch or its field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when
handling the S4200-ON Series and its components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this switch.
Topics:

Unpack the switch

Rack or cabinet installation
ReadyRails Installation
S4200-ON Series switch installation
Ground cable
Optics installation
Switch power-up
After switch installation
Switch replacement
Unpack the switch
NOTE:
Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch, make sure that the following items are included:
One S4200-ON Series (S4248FB-ON or S4248FBL-ON) switch
One RJ-45 to DB-9 female cable
Two sets of rail kits, no tools required
Two PSUs and power cords
Five fan units
Two country- and region-specific AC power cords
S4200-ON Series Set-up Guide
Safety and Regulatory Information
Warranty and Support Information

Unpack

1
Place the container on a clean, flat surface and cut all straps securing the container.
2
Open the container or remove the container top.
3
Carefully remove the switch from the container and place it on a secure and clean surface.

S4200-ON Series installation

S4200-ON Series installation
5
19