Dell S4248FB-ON Instrukcja instalacji - Strona 17

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Przełącznik Dell S4248FB-ON. Dell S4248FB-ON 47 stron. S4200-on series
Również dla Dell S4248FB-ON: Instrukcja konfiguracji (29 strony)

Dell S4248FB-ON Instrukcja instalacji
Figure 6. GND lug assembly
1
Remove the two installed M3 screws from the lower-left side of your switch.
NOTE:
Keep these screws.
2
Remove the bracket assembly from the shipping bag.
3
Clean the bracket and lug surfaces thoroughly and apply an anti-oxidant solution to the mating surfaces.
4
Attach the switch ground using the
5
Using the two removed screws, attach the GND lug bracket assembly to your switch, as shown.
Torque the M3 screws to ±4-5 in-lbs.
Figure 7. Attach the GND lug assembly
Ground cable
instructions.
NEBS compliance
17