Dell Z9100-ON Instrukcja instalacji - Strona 18
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Przełącznik Dell Z9100-ON. Dell Z9100-ON 43 stron. Open networking
Również dla Dell Z9100-ON: Instrukcja instalacji (45 strony), Instrukcja instalacji (45 strony)
Figure 6. Two-Post Flush-Mount Configuration
2.
Attach one rail to the front post flange with two user-supplied screws. See item 2.
3.
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post
flange with two user-supplied screws. See item 3.
4.
Repeat this procedure for the second rail.
Configuring a Two-Post Center-Mount
To configure a two-post center-mount installation, follow these steps.
1.
Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post
flange with two user-supplied screws. See the following illustration, item 1.
18
Install the Z9100–ON