Dell Z9100-ON 설치 매뉴얼 - 페이지 18
{카테고리_이름} Dell Z9100-ON에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dell Z9100-ON 43 페이지. Open networking
Dell Z9100-ON에 대해서도 마찬가지입니다: 설치 매뉴얼 (45 페이지), 설치 매뉴얼 (45 페이지)
Figure 6. Two-Post Flush-Mount Configuration
2.
Attach one rail to the front post flange with two user-supplied screws. See item 2.
3.
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post
flange with two user-supplied screws. See item 3.
4.
Repeat this procedure for the second rail.
Configuring a Two-Post Center-Mount
To configure a two-post center-mount installation, follow these steps.
1.
Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post
flange with two user-supplied screws. See the following illustration, item 1.
18
Install the Z9100–ON