HP StorageWorks director 2/140 Instrukcja instalacji - Strona 13

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Przełącznik HP StorageWorks director 2/140. HP StorageWorks director 2/140 24 stron. Universal port module kit
Również dla HP StorageWorks director 2/140: Instrukcja instalacji (22 strony)

HP StorageWorks director 2/140 Instrukcja instalacji
Touch the chassis once before performing any maintenance action, and once each
minute while installing UPMs.
1
ESD Grounding Point
Figure 3: ESD grounding point (rear)

Removing the UPM Filler Blank

Use the following procedure to remove a UPM filler blank. Filler blanks cover and
protect unused UPM card slots in the director chassis. A list of required tools is provided.

Required Tools

The torque tool and hex adapter (provided with the director) are required to perform
the installation procedures.

Removal

To remove a filler blank:
1. Unlock and open the cabinet front door if the director is rack-mounted and
installed in a custom equipment cabinet. If the director is installed in a stand-alone
configuration, go to
2. Identify the filler blank to be removed.
The filler blank is secured to the director chassis with two captive Allen screws. Both
screws are spring-loaded to lock the filler blank in place.
universal port module kit installation instructions
1
step
2.
Installation Instructions
SHR 2300
5