HP StorageWorks director 2/140 Instrukcja instalacji - Strona 15
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Przełącznik HP StorageWorks director 2/140. HP StorageWorks director 2/140 24 stron. Universal port module kit
Również dla HP StorageWorks director 2/140: Instrukcja instalacji (22 strony)
Figure 5: Director 2/140 UPM filler blank removal
4. Pull the filler blank out and remove it from the director chassis.
Installing the UPM Card
Use the following procedures to install a UPM card. A list of required tools is
provided.
Required Tools
The following tools are required to perform these procedures.
•
ESD grounding cable and wrist strap.
•
Torque tool and hex adapter (provided with the director).
•
Fiber optic protective plugs (provided with the director).
universal port module kit installation instructions
Installation Instructions
7