Olympus BH2-CH Substage Montaż - Strona 16

Przeglądaj online lub pobierz pdf Montaż dla Mikroskop Olympus BH2-CH Substage. Olympus BH2-CH Substage 26 stron.

Olympus BH2-CH Substage Montaż

Reinstall the Locking and Centering Thumbscrews

Lightly grease the threads of the condenser-locking
thumbscrew (see
Figure
thumbscrew into the centering yoke (see
Figure 52 – Lightly grease the locking thumbscrew
Figure 53 – Reinstall the locking thumbscrew
Lightly grease the threads of the two condenser-
centering thumbscrews (see
thumbscrews into the support yoke (see
Figure 54 – Lightly grease the centering thumbscrews
Complete Teardown, Cleaning/Lubrication, and Reassembly of the Olympus BH2-CH Substage Assembly
52) and reinstall the
Figure
53).
Figure
54) and reinstall the
Figure
55).
Figure 55 – Reinstall the centering thumbscrews

Disassemble the Friction Lock

Note: Disassembly of the friction lock is not necessary, but is shown here for
the sake of completeness.
Use a 3.0mm Allen wrench or driver to remove the
M4x12 hex socket-head cap screw for the plastic
friction lock (see
Figure
Figure 56 – Loosen and remove the friction-lock screw
Remove the plastic friction lock from the bore in the
left-hand side of the main housing (see
Figure 57 – Remove the plastic friction lock from housing

Reassemble the Friction Lock

Insert the plastic friction lock into the bore in the left-
hand side of the main housing, with the recessed hole
facing outwards (see
Figure
56).
Figure
57).
58).
Revision 1
Page 16 of 26