Freedom of movement is essential for the proper functioning of the scale.
1. Check that the load bearing implement can oscillate freely within the pendulum travel of the
load foots.
– Slightly lift the load cells one after the other.
– Center the load foots.
2. If there are more than three load points, check that the load is distributed evenly across all
load cells.
3. Check the weight display at the load points.
4. Correct any deviations before commissioning.
5.10

Screw on the grounding cable

1. Prepare a permanently contacting bolted connection such as M10 on the load bearing
implement and foundation for securing the grounding cable.
2. Screw the grounding cable tight.
5.11

Dismantling

For dismantling the load cells, the same safety rules (Page 17) apply as for installation.
1. Disconnect all the supply voltages and auxiliary voltages.
2. Secure the load carrier against falling.
3. Use appropriate hoisting gear and tools.
4. Take the load off the load cell.
5. Carefully remove the load cell without using force. Do not pull on the cable of the load cell.
6. If you intend to reinstall the load cell or send it for repair, do not cut the load cell cable.
7. Do not carry the load cell by the cable.
SB-S CA
Manual, 06/2019, A5E47600142-AA
Installing/mounting
5.11 Dismantling