Cisco 12016 Instrukcja wymiany - Strona 24

Przeglądaj online lub pobierz pdf Instrukcja wymiany dla Router sieciowy Cisco 12016. Cisco 12016 32 stron. Blower module and air filter for cisco 12016, cisco 12416, and cisco 12816 router
Również dla Cisco 12016: Instrukcja rozpakowywania Podręcznik (28 strony), Arkusz danych (9 strony), Instrukcja obsługi (16 strony), Instrukcja wymiany (18 strony)

Cisco 12016 Instrukcja wymiany
Removing and Installing the Chassis
The hold-down brackets are not symmetrical: The bracket plate that fastens to the side of the scissor-jack
Note
platform is narrower than the bracket plate that fastens to the top of the pallet, and has smaller-diameter
bolt holes.
Position the U-shaped pallet body behind the scissor-jack pallet with the opening facing the back panel
Step 2
of the chassis.
Use the 3/4-inch (19-mm) socket and ratchet wrench to turn the scissor-jack screw slowly
Step 3
counterclockwise to expand the scissor-jack platform and raise the top of the scissor-jack platform high
enough for the hold-down brackets to clear the top of the pallet body.
Slide the pallet body around the scissor-jack platform.
Step 4
Figure 16
Step 5
Slide the pallet front bar into the opening on the pallet body and use the hinge locks to secure it as
instructed in these steps:
Pivot the butterfly handle on the hinge lock up so that it is perpendicular to the body of the hinge
a.
lock.
Twist the butterfly handle counterclockwise to extend the hinge lock hook to its maximum reach.
b.
Lower the hinge lock hook over the hinge lock catch on the pallet body.
c.
Twist the butterfly handle clockwise to clamp the hinge lock hook on the hinge lock catch on the
d.
pallet body.
Pivot the butterfly lever down onto the hinge lock body so that it lies flat.
e.
Shift the pallet to ensure that it is positioned evenly all the way around the scissor-jack platform and that
Step 6
the bolt holes in the hold-down brackets on the scissor-jack platform are aligned with the holes in the
top of the shipping pallet.
Turn the scissor-jack screw slowly clockwise to collapse the scissor-jack platform and lower the top of
Step 7
the scissor-jack platform slowly until the hold-down brackets contact the top of the shipping pallet.
Cisco 12016, Cisco 12416, and Cisco 12816 Router Chassis Replacement Instructions
24
Installing the Chassis and Scissor-Jack Platform on the Shipping Pallet
Pallet front bar
Pallet body
Top view of pallet parts
78-16082-01