TomTom LINK 510 Instrukcja instalacji - Strona 15
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla GPS TomTom LINK 510. TomTom LINK 510 35 stron. Vehicle tracking device
Również dla TomTom LINK 510: Podręcznik użytkownika (37 strony), Instrukcja instalacji (16 strony)
8.
Connecting to power
Connect the LINK 510 to the vehicle power supply with the standard vehicle voltage (12 V/
Con-
nect-
ing to
power
24 V). Do not connect to a voltage converter. The three wires GND, IGN and PWR+ (supply
voltage) must be connected.
Important: Follow the order of connecting the wires as described below. First connect the
wires then insert the plug into the LINK 510.
If you have inserted the plug into the LINK 510 first, you must connect the GND wire before
you connect the PWR+ wire and the IGN wire as described below.
1. Connect the GND wire (brown) to ground (clamp 31).
2. Connect the PWR+ wire (red) to the carry current (clamp 30).
The connection must be fused with max. 10A. If not, fuse the the PWR+ wire with one
2A fast blow fuse.
3. Connect the IGN wire (black) to ignition (clamp 15).
The connection must be fused with max. 10A. If not, fuse the the IGN wire with one 2A
fast blow fuse.
4. Insert the 3-pin plug into the power cable connector.
If you need to disconnect the wires while the 3-pin plug is plugged in the LINK 510 make
sure you disconnect the GND wire last.
15